Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by Crossref.
Hadda, Hatem
Dridi, Najoua
and
Hajri-Gabouj, Sonia
2012.
A note on the two-stage hybrid flow shop problem with dedicated machines.
Optimization Letters,
Vol. 6,
Issue. 8,
p.
1731.
Hadda, Hatem
2013.
A note on “A heuristic method for two-stage hybrid flow shop with dedicated machines”.
Computers & Operations Research,
Vol. 40,
Issue. 10,
p.
2283.
Chikhi, Nacira
Benmansour, Rachid
Bekrar, Abdelghani
Hanafi, Said
and
Abbas, Moncef
2014.
A case study of a two-stage flow shop with dedicated machines and a single robot.
p.
246.
Hadda, Hatem
Dridi, Najoua
and
Hajri-Gabouj, Sonia
2014.
Exact resolution of the two-stage hybrid flow shop with dedicated machines.
Optimization Letters,
Vol. 8,
Issue. 8,
p.
2329.
Hadda, Hatem
Dridi, Najoua
and
Hajji, Mohamed Karim
2018.
On the optimality conditions of the two-machine flow shop problem.
European Journal of Operational Research,
Vol. 266,
Issue. 2,
p.
426.
Hajji, Mohamed Karim
Hadda, Hatem
and
Dridi, Najoua
2023.
Makespan Minimization for the Two-Stage Hybrid Flow Shop Problem with Dedicated Machines: A Comprehensive Study of Exact and Heuristic Approaches.
Computation,
Vol. 11,
Issue. 7,
p.
137.
Hadda, Hatem
Dridi, Najoua
and
Hajri-Gabouj, Sonia
2024.
On the two-stage assembly flow shop problem.
TOP,
Vol. 32,
Issue. 2,
p.
224.