Hostname: page-component-cb9f654ff-5jtmz Total loading time: 0 Render date: 2025-08-29T16:52:05.285Z Has data issue: false hasContentIssue false

The lifetime impact of attention deficit hyperactivity disorder: results from the National Epidemiologic Survey on Alcohol and Related Conditions (NESARC)

Published online by Cambridge University Press:  16 August 2011

S. Bernardi*
Affiliation:
Department of Psychiatry, Columbia University/New York State Psychiatric Institute, New York, NY, USA
S. V. Faraone
Affiliation:
Departments of Psychiatry and of Neuroscience and Physiology, SUNY Upstate Medical University, Syracuse, NY, USA
S. Cortese
Affiliation:
Institute for Pediatric Neuroscience, New York University Child Study Center, New York City, NY, USA
B. T. Kerridge
Affiliation:
Department of Epidemiology and Biostatistics, School of Public Health, University of Maryland, College Park, MD, USA
S. Pallanti
Affiliation:
Department of Psychiatry, University of Florence, Italy
S. Wang
Affiliation:
Department of Psychiatry, Columbia University/New York State Psychiatric Institute, New York, NY, USA
C. Blanco
Affiliation:
Department of Psychiatry, Columbia University/New York State Psychiatric Institute, New York, NY, USA
*
*Address for correspondence: S. Bernardi, M.D., Department of Psychiatry, New York State Psychiatric Institute/Columbia University, 1051 Riverside Drive, Unit 69, New York, NY, USA. (Email: silvia.bernardi@gmail.com)

Abstract

Background

The aim of the study was to present nationally representative data on the lifetime independent association between attention deficit hyperactivity disorder (ADHD) and psychiatric co-morbidity, correlates, quality of life and treatment seeking in the USA.

Method

Data were derived from a large national sample of the US population. Face-to-face surveys of more than 34 000 adults aged 18 years and older residing in households were conducted during the 2004–2005 period. Diagnoses of ADHD, Axis I and II disorders were based on the Alcohol Use Disorder and Associated Disabilities Interview Schedule-DSM-IV version.

Results

ADHD was associated independently of the effects of other psychiatric co-morbidity with increased risk of bipolar disorder, generalized anxiety disorder, post-traumatic stress disorder, specific phobia, and narcissistic, histrionic, borderline, antisocial and schizotypal personality disorders. A lifetime history of ADHD was also associated with increased risk of engaging in behaviors reflecting lack of planning and deficient inhibitory control, with high rates of adverse events, lower perceived health, social support and higher perceived stress. Fewer than half of individuals with ADHD had ever sought treatment, and about one-quarter had ever received medication. The average age of first treatment contact was 18.40 years.

Conclusions

ADHD is common and associated with a broad range of psychiatric disorders, impulsive behaviors, greater number of traumas, lower quality of life, perceived social support and social functioning, even after adjusting for additional co-morbidity. When treatment is sought, it is often in late adolescence or early adulthood, suggesting the need to improve diagnosis and treatment of ADHD.

Information

Type
Original Articles
Copyright
Copyright © Cambridge University Press 2011

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Article purchase

Temporarily unavailable

References

Able, SL, Johnston, JA, Adler, LA, Swindle, RW (2007). Functional and psychosocial impairment in adults with undiagnosed ADHD. Psychological Medicine 37, 97–107.CrossRefGoogle ScholarPubMed
Agresti, A (2002). Categorical Data Analysis. John Wiley & Sons: Hoboken, NJ.CrossRefGoogle Scholar
Anckarsater, H, Stahlberg, O, Larson, T, Hakansson, C, Jutblad, SB, Niklasson, L, Nyden, A, Wentz, E, Westergren, S, Cloninger, CR, Gillberg, C, Rastam, M (2006). The impact of ADHD and autism spectrum disorders on temperament, character, and personality development. American Journal of Psychiatry 163, 12391244.CrossRefGoogle ScholarPubMed
August, GJ, Winters, KC, Realmuto, GM, Fahnhorst, T, Botzet, A, Lee, S (2006). Prospective study of adolescent drug use among community samples of ADHD and non-ADHD participants. Journal of the American Academy of Child and Adolescent Psychiatry 45, 824832.CrossRefGoogle ScholarPubMed
Barkley, RA (1997). Behavioral inhibition, sustained attention, and executive functions: constructing a unifying theory of ADHD. Psychological Bulletin 121, 6594.CrossRefGoogle ScholarPubMed
Barkley, RA (2002). Major life activity and health outcomes associated with attention-deficit/hyperactivity disorder. Journal of Clinical Psychiatry 63 (Suppl. 12), 1015.Google ScholarPubMed
Barkley, RA, Fischer, M, Edelbrock, CS, Smallish, L (1990). The adolescent outcome of hyperactive children diagnosed by research criteria: I. An 8-year prospective follow-up study. Journal of the American Academy of Child and Adolescent Psychiatry 29, 546557.CrossRefGoogle ScholarPubMed
Barkley, RA, Fischer, M, Smallish, L, Fletcher, K (2006). Young adult outcome of hyperactive children: adaptive functioning in major life activities. Journal of the American Academy of Child and Adolescent Psychiatry 45, 192202.CrossRefGoogle ScholarPubMed
Barkley, RA, Guevremont, DC, Anastopoulos, AD, DuPaul, GJ, Shelton, TL (1993). Driving-related risks and outcomes of attention deficit hyperactivity disorder in adolescents and young adults: a 3- to 5-year follow-up survey. Pediatrics 92, 212218.CrossRefGoogle Scholar
Barkley, RA, Murphy, KR, Dupaul, GI, Bush, T (2002). Driving in young adults with attention deficit hyperactivity disorder: knowledge, performance, adverse outcomes, and the role of executive functioning. Journal of the International Neuropsychological Society 8, 655672.CrossRefGoogle ScholarPubMed
Bernstein, DP, Cohen, P, Skodol, A, Bezirganian, S, Brook, JS (1996). Childhood antecedents of adolescent personality disorders. American Journal of Psychiatry 153, 907913.Google ScholarPubMed
Biederman, J, Faraone, SV, Spencer, TJ, Mick, E, Monuteaux, MC, Aleardi, M (2006 a). Functional impairments in adults with self-reports of diagnosed ADHD: a controlled study of 1001 adults in the community. Journal of Clinical Psychiatry 67, 524540.CrossRefGoogle ScholarPubMed
Biederman, J, Makris, N, Valera, EM, Monuteaux, MC, Goldstein, JM, Buka, S, Boriel, DL, Bandyopadhyay, S, Kennedy, DN, Caviness, VS, Bush, G, Aleardi, M, Hammerness, P, Faraone, SV, Seidman, LJ (2008 a). Towards further understanding of the co-morbidity between attention deficit hyperactivity disorder and bipolar disorder: a MRI study of brain volumes. Psychological Medicine 38, 10451056.CrossRefGoogle ScholarPubMed
Biederman, J, Mick, E, Faraone, SV, Burback, M (2001). Patterns of remission and symptom decline in conduct disorder: a four-year prospective study of an ADHD sample. Journal of the American Academy of Child and Adolescent Psychiatry 40, 290298.CrossRefGoogle ScholarPubMed
Biederman, J, Monuteaux, MC, Mick, E, Spencer, T, Wilens, TE, Silva, JM, Snyder, LE, Faraone, SV (2006 b). Young adult outcome of attention deficit hyperactivity disorder: a controlled 10-year follow-up study. Psychological Medicine 36, 167179.CrossRefGoogle ScholarPubMed
Biederman, J, Newcorn, J, Sprich, S (1991). Comorbidity of attention deficit hyperactivity disorder with conduct, depressive, anxiety, and other disorders. American Journal of Psychiatry 148, 564577.Google ScholarPubMed
Biederman, J, Petty, CR, Dolan, C, Hughes, S, Mick, E, Monuteaux, MC, Faraone, SV (2008 b). The long-term longitudinal course of oppositional defiant disorder and conduct disorder in ADHD boys: findings from a controlled 10-year prospective longitudinal follow-up study. Psychological Medicine 38, 10271036.CrossRefGoogle ScholarPubMed
Burke, JD, Loeber, R, Lahey, BB (2001). Which aspects of ADHD are associated with tobacco use in early adolescence? Journal of Child Psychology and Psychiatry 42, 493502.CrossRefGoogle ScholarPubMed
Candy, M, Jones, L, Williams, R, Tookman, A, King, M (2008). Psychostimulants for depression. Cochrane Database of Systematic Reviews. Issue 2. Art. No.: CD006722. DOI: 10.1002/14651858.CD006722.CrossRefGoogle ScholarPubMed
Canino, G, Bravo, M, Ramirez, R, Febo, VE, Rubio-Stipec, M, Fernandez, RL, Hasin, D (1999). The Spanish Alcohol Use Disorder and Associated Disabilities Interview Schedule (AUDADIS): reliability and concordance with clinical diagnoses in a Hispanic population. Journal of Studies on Alcohol 60, 790799.CrossRefGoogle Scholar
Centers for Disease Control and Prevention (2010). Increasing prevalence of parent-reported attention-deficit/hyperactivity disorder among children – United States, 2003 and 2007. Morbidity and Mortality Weekly Report 59, 14391443.Google Scholar
Chatterji, S, Saunders, JB, Vrasti, R, Grant, BF, Hasin, D, Mager, D (1997). Reliability of the alcohol and drug modules of the Alcohol Use Disorder and Associated Disabilities Interview Schedule – Alcohol/Drug-Revised (AUDADIS-ADR): an international comparison. Drug and Alcohol Dependence 47, 171185.CrossRefGoogle Scholar
Cohen, S, Doyle, WJ, Skoner, DP, Rabin, BS, Gwaltney, JM Jr. (1997). Social ties and susceptibility to the common cold. Journal of the American Medical Association 277, 19401944.CrossRefGoogle ScholarPubMed
Cohen, S, Williamson, G (1988). Perceived stress in a probability sample of the United States. In The Social Psychology of Health: Claremont Symposium on Applied Social Psychology (ed. Spaceapam, S. and Oskamp, S.), pp. 3167. Sage: Newbury Park, NJ.Google Scholar
Compton, WM, Conway, KP, Stinson, FS, Colliver, JD, Grant, BF (2005). Prevalence, correlates, and comorbidity of DSM-IV antisocial personality syndromes and alcohol and specific drug use disorders in the United States: results from the National Epidemiologic Survey on Alcohol and Related Conditions. Journal of Clinical Psychiatry 66, 677685.CrossRefGoogle ScholarPubMed
Cortese, S, Bernardina, BD, Mouren, MC (2007). Attention-deficit/hyperactivity disorder (ADHD) and binge eating. Nutrition Reviews 65, 404411.CrossRefGoogle ScholarPubMed
Cottler, LB, Grant, BF, Blaine, J, Mavreas, V, Pull, C, Hasin, D, Compton, WM, Rubio-Stipec, M, Mager, D (1997). Concordance of DSM-IV alcohol and drug use disorder criteria and diagnoses as measured by AUDADIS-ADR, CIDI and SCAN. Drug and Alcohol Dependence 47, 195205.CrossRefGoogle ScholarPubMed
Doyle, AE, Wilens, TE, Kwon, A, Seidman, LJ, Faraone, SV, Fried, R, Swezey, A, Snyder, L, Biederman, J (2005). Neuropsychological functioning in youth with bipolar disorder. Biological Psychiatry 58, 540548.CrossRefGoogle ScholarPubMed
Elkins, IJ, McGue, M, Iacono, WG (2007). Prospective effects of attention-deficit/hyperactivity disorder, conduct disorder, and sex on adolescent substance use and abuse. Archives of General Psychiatry 64, 11451152.CrossRefGoogle ScholarPubMed
Epstein, JN, Langberg, JM, Lichtenstein, PK, Mainwaring, BA, Luzader, CP, Stark, LJ (2008). Community-wide intervention to improve the attention-deficit/hyperactivity disorder assessment and treatment practices of community physicians. Pediatrics 122, 1927.CrossRefGoogle ScholarPubMed
Faraone, SV, Biederman, J, Mick, E (2006 a). The age-dependent decline of attention deficit hyperactivity disorder: a meta-analysis of follow-up studies. Psychological Medicine 36, 159165.CrossRefGoogle ScholarPubMed
Faraone, SV, Biederman, J, Monuteaux, MC (2001). Attention deficit hyperactivity disorder with bipolar disorder in girls: further evidence for a familial subtype? Journal of Affective Disorders 64, 1926.CrossRefGoogle ScholarPubMed
Faraone, SV, Biederman, J, Spencer, T, Mick, E, Murray, K, Petty, C, Adamson, JJ, Monuteaux, MC (2006 b). Diagnosing adult attention deficit hyperactivity disorder: are late onset and subthreshold diagnoses valid? American Journal of Psychiatry 163, 17201729.CrossRefGoogle ScholarPubMed
Faraone, SV, Biederman, J, Spencer, T, Wilens, T, Seidman, LJ, Mick, E, Doyle, AE (2000). Attention-deficit/hyperactivity disorder in adults: an overview. Biological Psychiatry 48, 9–20.CrossRefGoogle ScholarPubMed
Faraone, SV, Kunwar, A, Adamson, J, Biederman, J (2009). Personality traits among ADHD adults: implications of late-onset and subthreshold diagnoses. Psychological Medicine 39, 685693.CrossRefGoogle ScholarPubMed
Faraone, SV, Wilens, T (2003). Does stimulant treatment lead to substance use disorders? Journal of Clinical Psychiatry 64 (Suppl. 11), 9–13.Google ScholarPubMed
Faregh, N, Derevensky, J (2011). Gambling behavior among adolescents with attention deficit/hyperactivity disorder. Journal of Gambling Studies 27, 243256.CrossRefGoogle ScholarPubMed
Fayyad, J, De Graaf, R, Kessler, R, Alonso, J, Angermeyer, M, Demyttenaere, K, De Girolamo, G, Haro, JM, Karam, EG, Lara, C, Lepine, JP, Ormel, J, Posada-Villa, J, Zaslavsky, AM, Jin, R (2007). Cross-national prevalence and correlates of adult attention-deficit hyperactivity disorder. British Journal of Psychiatry 190, 402409.CrossRefGoogle ScholarPubMed
Fried, R, Petty, CR, Surman, CB, Reimer, B, Aleardi, M, Martin, JM, Coughlin, JF, Biederman, J (2006). Characterizing impaired driving in adults with attention-deficit/hyperactivity disorder: a controlled study. Journal of Clinical Psychiatry 67, 567574.CrossRefGoogle ScholarPubMed
Froehlich, TE, Lanphear, BP, Epstein, JN, Barbaresi, WJ, Katusic, SK, Kahn, RS (2007). Prevalence, recognition, and treatment of attention-deficit/hyperactivity disorder in a national sample of US children. Archives of Pediatrics and Adolescent Medicine 161, 857864.CrossRefGoogle Scholar
Grant, B, Dawson, D, Hasin, D (2007 a). The Alcohol Use Disorder and Associated Disabilities Interview Schedule–DSM-IV Version. National Institute of Alcohol Abuse and Alcoholism, Rockville, MD, 2001.Google Scholar
Grant, B, Dawson, D, Hasin, D (2007 b). The Alcohol Use Disorder and Associated Disabilities Interview Schedule-DSM-IV Version, Wave 2. National Institute of Alcohol Abuse and Alcoholism, Rockville, MD, 2004.Google Scholar
Grant, BF, Dawson, DA, Stinson, FS, Chou, PS, Kay, W, Pickering, R (2003). The Alcohol Use Disorder and Associated Disabilities Interview Schedule-IV (AUDADIS-IV): reliability of alcohol consumption, tobacco use, family history of depression and psychiatric diagnostic modules in a general population sample. Drug and Alcohol Dependence 71, 7–16.CrossRefGoogle Scholar
Grant, BF, Goldstein, RB, Chou, SP, Huang, B, Stinson, FS, Dawson, DA, Saha, TD, Smith, SM, Pulay, AJ, Pickering, RP, Ruan, WJ, Compton, WM (2009). Sociodemographic and psychopathologic predictors of first incidence of DSM-IV substance use, mood and anxiety disorders: results from the Wave 2 National Epidemiologic Survey on Alcohol and Related Conditions. Molecular Psychiatry 14, 10511066.CrossRefGoogle ScholarPubMed
Grant, BF, Harford, TC, Dawson, DA, Chou, PS, Pickering, RP (1995). The Alcohol Use Disorder and Associated Disabilities Interview schedule (AUDADIS): reliability of alcohol and drug modules in a general population sample. Drug and Alcohol Dependence 39, 3744.CrossRefGoogle Scholar
Grant, BF, Hasin, DS, Blanco, C, Stinson, FS, Chou, SP, Goldstein, RB, Dawson, DA, Smith, S, Saha, TD, Huang, B (2005). The epidemiology of social anxiety disorder in the United States: results from the National Epidemiologic Survey on Alcohol and Related Conditions. Journal of Clinical Psychiatry 66, 13511361.CrossRefGoogle ScholarPubMed
Grant, BF, Hasin, DS, Stinson, FS, Dawson, DA, Chou, SP, Ruan, WJ, Pickering, RP (2004 a). Prevalence, correlates, and disability of personality disorders in the United States: results from the national epidemiologic survey on alcohol and related conditions. Journal of Clinical Psychiatry 65, 948958.CrossRefGoogle ScholarPubMed
Grant, BF, Hasin, DS, Stinson, FS, Dawson, DA, Goldstein, RB, Smith, S, Huang, B, Saha, TD (2006). The epidemiology of DSM-IV panic disorder and agoraphobia in the United States: results from the National Epidemiologic Survey on Alcohol and Related Conditions. Journal of Clinical Psychiatry 67, 363374.CrossRefGoogle ScholarPubMed
Grant, BF, Stinson, FS, Dawson, DA, Chou, SP, Ruan, WJ, Pickering, RP (2004 b). Co-occurrence of 12-month alcohol and drug use disorders and personality disorders in the United States: results from the National Epidemiologic Survey on Alcohol and Related Conditions. Archives of General Psychiatry 61, 361368.CrossRefGoogle ScholarPubMed
Hasin, D, Carpenter, KM, McCloud, S, Smith, M, Grant, BF (1997). The alcohol use disorder and associated disabilities interview schedule (AUDADIS): reliability of alcohol and drug modules in a clinical sample. Drug and Alcohol Dependence 44, 133141.CrossRefGoogle Scholar
Hasin, D, Paykin, A (1999). Alcohol dependence and abuse diagnoses: concurrent validity in a nationally representative sample. Alcoholism, Clinical and Experimental Research 23, 144150.Google Scholar
Hasin, DS, Goodwin, RD, Stinson, FS, Grant, BF (2005). Epidemiology of major depressive disorder: results from the National Epidemiologic Survey on Alcoholism and Related Conditions. Archives of General Psychiatry 62, 10971106.CrossRefGoogle ScholarPubMed
Hasin, DS, Grant, B, Endicott, J (1990). The natural history of alcohol abuse: implications for definitions of alcohol use disorders. American Journal of Psychiatry 147, 15371541.Google ScholarPubMed
Hasin, DS, Schuckit, MA, Martin, CS, Grant, BF, Bucholz, KK, Helzer, JE (2003). The validity of DSM-IV alcohol dependence: what do we know and what do we need to know? Alcoholism, Clinical and Experimental Research 27, 244252.CrossRefGoogle ScholarPubMed
Jacob, CP, Romanos, J, Dempfle, A, Heine, M, Windemuth-Kieselbach, C, Kruse, A, Reif, A, Walitza, S, Romanos, M, Strobel, A, Brocke, B, Schafer, H, Schmidtke, A, Boning, J, Lesch, KP (2007). Co-morbidity of adult attention-deficit/hyperactivity disorder with focus on personality traits and related disorders in a tertiary referral center. European Archives of Psychiatry and Clinical Neuroscience 257, 309317.CrossRefGoogle ScholarPubMed
Kessler, RC, Adler, L, Barkley, R, Biederman, J, Conners, CK, Demler, O, Faraone, SV, Greenhill, LL, Howes, MJ, Secnik, K, Spencer, T, Ustun, TB, Walters, EE, Zaslavsky, AM (2006). The prevalence and correlates of adult ADHD in the United States: results from the National Comorbidity Survey Replication. American Journal of Psychiatry 163, 716723.CrossRefGoogle ScholarPubMed
Kessler, RC, Lane, M, Stang, PE, Van Brunt, DL (2009). The prevalence and workplace costs of adult attention deficit hyperactivity disorder in a large manufacturing firm. Psychological Medicine 39, 137147.CrossRefGoogle Scholar
Kieling, C, Kieling, RR, Rohde, LA, Frick, PJ, Moffitt, T, Nigg, JT, Tannock, R, Castellanos, FX (2010). The age at onset of attention deficit hyperactivity disorder. American Journal of Psychiatry 167, 1416.CrossRefGoogle ScholarPubMed
Lara, DR, Pinto, O, Akiskal, K, Akiskal, HS (2006). Toward an integrative model of the spectrum of mood, behavioral and personality disorders based on fear and anger traits: I. Clinical implications. Journal of Affective Disorders 94, 6787.CrossRefGoogle ScholarPubMed
Lee, SS, Humphreys, KL, Flory, K, Liu, R, Glass, K (2011). Prospective association of childhood attention-deficit/hyperactivity disorder (ADHD) and substance use and abuse/dependence: a meta-analytic review. Clinical Psychology Review 31, 328341.CrossRefGoogle ScholarPubMed
Leibson, CL, Katusic, SK, Barbaresi, WJ, Ransom, J, O'Brien, PC (2001). Use and costs of medical care for children and adolescents with and without attention-deficit/hyperactivity disorder. Journal of the American Medical Association 285, 6066.CrossRefGoogle ScholarPubMed
Mannuzza, S, Klein, RG, Bessler, A, Malloy, P, LaPadula, M (1993). Adult outcome of hyperactive boys. Educational achievement, occupational rank, and psychiatric status. Archives of General Psychiatry 50, 565576.CrossRefGoogle ScholarPubMed
Merikangas, KR, He, JP, Burstein, M, Swanson, SA, Avenevoli, S, Cui, L, Benjet, C, Georgiades, K, Swendsen, J (2010). Lifetime prevalence of mental disorders in U.S. adolescents: results from the National Comorbidity Survey Replication–Adolescent Supplement (NCS-A). Journal of the American Academy of Child and Adolescent Psychiatry 49, 980989.CrossRefGoogle ScholarPubMed
Merikangas, KR, He, JP, Burstein, M, Swendsen, J, Avenevoli, S, Case, B, Georgiades, K, Heaton, L, Swanson, S, Olfson, M (2011). Service utilization for lifetime mental disorders in U.S. adolescents: results of the National Comorbidity Survey–Adolescent Supplement (NCS-A). Journal of the American Academy of Child and Adolescent Psychiatry 50, 3245.CrossRefGoogle ScholarPubMed
Meyers, JL, Classi, PM, Wietecha, LA, Candrilli, SD (2010). Economic burden and comorbidities of attention-deficit/hyperactivity disorder among pediatric patients hospitalized in the United States. Child and Adolescent Psychiatry and Mental Health 4, 31.CrossRefGoogle ScholarPubMed
Miller, CJ, Flory, JD, Miller, SR, Harty, SC, Newcorn, JH, Halperin, JM (2008). Childhood attention-deficit/hyperactivity disorder and the emergence of personality disorders in adolescence: a prospective follow-up study. Journal of Clinical Psychiatry 69, 14771484.CrossRefGoogle ScholarPubMed
Molina, BS, Pelham, WE, Gnagy, EM, Thompson, AL, Marshal, MP (2007). Attention-deficit/hyperactivity disorder risk for heavy drinking and alcohol use disorder is age specific. Alcoholism, Clinical and Experimental Research 31, 643654.CrossRefGoogle ScholarPubMed
Nierenberg, AA, Miyahara, S, Spencer, T, Wisniewski, SR, Otto, MW, Simon, N, Pollack, MH, Ostacher, MJ, Yan, L, Siegel, R, Sachs, GS (2005). Clinical and diagnostic implications of lifetime attention-deficit/hyperactivity disorder comorbidity in adults with bipolar disorder: data from the first 1000 STEP-BD participants. Biological Psychiatry 57, 14671473.CrossRefGoogle ScholarPubMed
Petry, NM, Stinson, FS, Grant, BF (2005). Comorbidity of DSM-IV pathological gambling and other psychiatric disorders: results from the National Epidemiologic Survey on Alcohol and Related Conditions. Journal of Clinical Psychiatry 66, 564574.CrossRefGoogle ScholarPubMed
Polanczyk, G, de Lima, MS, Horta, BL, Biederman, J, Rohde, LA (2007). The worldwide prevalence of ADHD: a systematic review and metaregression analysis. American Journal of Psychiatry 64, 942948.CrossRefGoogle Scholar
Pull, CB, Saunders, JB, Mavreas, V, Cottler, LB, Grant, BF, Hasin, DS, Blaine, J, Mager, D, Ustun, BT (1997). Concordance between ICD-10 alcohol and drug use disorder criteria and diagnoses as measured by the AUDADIS-ADR, CIDI and SCAN: results of a cross-national study. Drug and Alcohol Dependence 47, 207216.CrossRefGoogle ScholarPubMed
Room, R, Janca, A, Bennett, LA, Schmidt, L, Sartorius, N (1996). WHO cross-cultural applicability research on diagnosis and assessment of substance use disorders: an overview of methods and selected results. Addiction 91, 199220.Google ScholarPubMed
Rosler, M, Retz, W, Retz-Junginger, P, Hengesch, G, Schneider, M, Supprian, T, Schwitzgebel, P, Pinhard, K, Dovi-Akue, N, Wender, P, Thome, J (2004). Prevalence of attention deficit-/hyperactivity disorder (ADHD) and comorbid disorders in young male prison inmates. European Archives of Psychiatry and Clinical Neuroscience 254, 365371.CrossRefGoogle ScholarPubMed
Ruan, WJ, Goldstein, RB, Chou, SP, Smith, SM, Saha, TD, Pickering, RP, Dawson, DA, Huang, B, Stinson, FS, Grant, BF (2008). The alcohol use disorder and associated disabilities interview schedule-IV (AUDADIS-IV): reliability of new psychiatric diagnostic modules and risk factors in a general population sample. Drug and Alcohol Dependence 92, 2736.CrossRefGoogle Scholar
Singh, MK, DelBello, MP, Kowatch, RA, Strakowski, SM (2006). Co-occurrence of bipolar and attention-deficit hyperactivity disorders in children. Bipolar Disorder 8, 710720.CrossRefGoogle ScholarPubMed
Sonuga-Barke, EJ, Dalen, L, Remington, B (2003). Do executive deficits and delay aversion make independent contributions to preschool attention-deficit/hyperactivity disorder symptoms? Journal of the American Academy of Child and Adolescent Psychiatry 42, 13351342.CrossRefGoogle ScholarPubMed
Swanson, JM (2003). Role of executive function in ADHD. Journal of Clinical Psychiatry 64 (Suppl. 14), 3539.Google ScholarPubMed
Swensen, A, Birnbaum, HG, Ben, HR, Greenberg, P, Cremieux, PY, Secnik, K (2004). Incidence and costs of accidents among attention-deficit/hyperactivity disorder patients. Journal of Adolescent Health 35, 346349.CrossRefGoogle ScholarPubMed
Ware, J, Kosinski, M, Turner Bowker, D, Gandek, B (2002). How to Score Version 2 of the SF-12 Health Survey. Quality Metrics: Lincoln, RI.Google Scholar
Wilens, TE, Faraone, SV, Biederman, J, Gunawardene, S (2003). Does stimulant therapy of attention-deficit/hyperactivity disorder beget later substance abuse? A meta-analytic review of the literature. Pediatrics 111, 179185.CrossRefGoogle ScholarPubMed
Williams, RB, Marchuk, DA, Gadde, KM, Barefoot, JC, Grichnik, K, Helms, MJ, Kuhn, CM, Lewis, JG, Schanberg, SM, Stafford-Smith, M, Suarez, EC, Clary, GL, Svenson, IK, Siegler, IC (2003). Serotonin-related gene polymorphisms and central nervous system serotonin function. Neuropsychopharmacology 28, 533541.CrossRefGoogle ScholarPubMed
Supplementary material: File

Bernardi et al supplementary table

Table 1: Last twelve months psychiatric comorbidity of individuals with and without a lifetime diagnosis of ADHD in the National Epidemiologic Survey on Alcohol and Related Conditions

Download Bernardi et al supplementary table(File)
File 56.3 KB